{"id":33066,"date":"2026-07-27T09:04:11","date_gmt":"2026-07-27T07:04:11","guid":{"rendered":"https:\/\/www.grupomalasa.com\/?p=33066"},"modified":"2026-07-27T09:09:32","modified_gmt":"2026-07-27T07:09:32","slug":"guide-to-building-permits-for-renovating-a-commercial-space","status":"publish","type":"post","link":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/","title":{"rendered":"GUIDE TO BUILDING PERMITS FOR RENOVATING A COMMERCIAL SPACE"},"content":{"rendered":"<h2>What are building permits?<\/h2>\n<p>Building permits are <strong>administrative authorizations that must be obtained from the relevant city council<\/strong> in order to legally carry out construction or renovation work.<\/p>\n<p>These permits <strong>ensure that the work complies with current urban planning, safety<\/strong>, accessibility, and habitability regulations. Without this authorization, any work performed on commercial premises could be considered illegal and subject to penalties.<\/p>\n<p>&nbsp;<\/p>\n<h3>When are they required?<\/h3>\n<p>Building permits are <strong>required when<\/strong> the work <strong>may affect the safety<\/strong>, <strong>structure<\/strong>, or <strong>exterior appearance<\/strong> of the building, or <strong>compliance with zoning regulations<\/strong>; they are also typically required for major renovations, additions, or demolitions.<\/p>\n<h3 data-section-id=\"1ymfj7b\" data-start=\"940\" data-end=\"976\"><\/h3>\n<h2>Types of building permits<\/h2>\n<p>There are <strong>different types of building permits<\/strong>, depending on the size, location, or purpose of the project. Below, we explain the basic types: <strong>major building permits<\/strong> and <strong>minor building permits<\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<h3>Major construction permit<\/h3>\n<ul>\n<li>Construction of new buildings or premises.<\/li>\n<li>Building expansions.<\/li>\n<li>Comprehensive renovations of commercial premises.<\/li>\n<li>Structural modifications (such as the removal of load-bearing walls).<\/li>\n<li>Work that alters facades, roofs, or common areas.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-33072\" src=\"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/ESTRUCTURA-EN-OBRAS-300x147.jpg\" alt=\"Se observa la estructura de hormig\u00f3n armado de un edificio en construcci\u00f3n con escaleras visibles.\" width=\"922\" height=\"452\" srcset=\"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/ESTRUCTURA-EN-OBRAS-300x147.jpg 300w, https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/ESTRUCTURA-EN-OBRAS-768x376.jpg 768w, https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/ESTRUCTURA-EN-OBRAS.jpg 920w\" sizes=\"(max-width: 922px) 100vw, 922px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h3>Minor construction permit<\/h3>\n<p>A minor construction permit is required for simple renovations that do not affect the structure or safety of the building.<\/p>\n<p>It is typically required for projects such as:<\/p>\n<ul>\n<li>Painting of homes or commercial spaces.<\/li>\n<li>Replacement of flooring, tiles, or wall coverings.<\/li>\n<li>Renovating bathrooms or kitchens without structural changes<\/li>\n<li>Replacement of doors or windows<\/li>\n<li>Plumbing or electrical repairs.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-33124\" src=\"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/REFORMA-SUPERFICIAL-1-300x147.jpg\" alt=\"Una habitaci\u00f3n en reformas con paredes blancas, armarios empotrados, suelo cubierto de cart\u00f3n y puertas abiertas.\" width=\"918\" height=\"450\" srcset=\"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/REFORMA-SUPERFICIAL-1-300x147.jpg 300w, https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/REFORMA-SUPERFICIAL-1-768x376.jpg 768w, https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/REFORMA-SUPERFICIAL-1.jpg 920w\" sizes=\"(max-width: 918px) 100vw, 918px\" \/><\/p>\n<h3>Prior notice of construction work<\/h3>\n<p>Prior notification <strong>is an administrative procedure<\/strong> used to inform the city council of the <strong>intention to carry out minor construction work<\/strong> that, in many cases, <strong>does not require a full permit.<\/strong><\/p>\n<p>In many municipalities, <strong>this procedure replaces the formal permit<\/strong> for simple projects that have no significant structural or urban planning impact. It allows construction to begin after submitting the required documentation, provided that the requirements established by municipal regulations are met.<\/p>\n<p>&nbsp;<\/p>\n<h2>Building permit requirements<\/h2>\n<p>To obtain a building permit, you <strong>must submit an application to the city council<\/strong> along with the necessary <strong>documentation to verify<\/strong> that the construction project complies with urban planning and safety regulations.<\/p>\n<p>&nbsp;<\/p>\n<h3>Required documentation<\/h3>\n<p>It typically includes the <strong>official application from the city council<\/strong>, the <strong>owner\u2019s information<\/strong>, <strong>and details identifying the property<\/strong> where the work will be carried out.<\/p>\n<p><strong>Depending on the type of construction<\/strong>, a technical <strong>proposal may also be required, including plans, a descriptive report, and a budget<\/strong> prepared by a qualified professional.<\/p>\n<p>Proof of <strong>payment of municipal fees and taxes is usually submitted<\/strong>, along with other <strong>documents related to construction safety and waste management<\/strong>. In some cases, additional permits may be required, especially if the building is located in protected areas or affects common elements.<\/p>\n<p>&nbsp;<\/p>\n<h3>Municipal deadlines and fees<\/h3>\n<p>Processing times <strong>depend on the city council<\/strong> and the <strong>type of construction project<\/strong>.<\/p>\n<p>Permits for <strong>minor construction projects<\/strong> are typically processed <strong>within a few days or weeks<\/strong>, while permits for <strong>major construction projects<\/strong> can take several <strong>months<\/strong> due to technical and urban planning reviews.<\/p>\n<p>It is also necessary to pay municipal fees and taxes associated with the project.<\/p>\n<p>&nbsp;<\/p>\n<h2>How to apply for building permits<\/h2>\n<p>To apply for building permits, you must <strong>submit an application to the relevant city council<\/strong> along <strong>with the documentation required<\/strong> for the type of project.<\/p>\n<p>This typically includes the <strong>owner\u2019s information, a description of the work, a budget<\/strong>, and\u2014for major projects\u2014a technical plan prepared by a qualified professional.<\/p>\n<p>After submitting the documentation and paying the applicable municipal fees and taxes, <strong>the city council reviews the project to ensure it complies with urban planning<\/strong> and safety regulations. If everything is in order, <strong>it grants the permit or authorizes the prior notification<\/strong>, allowing the work to begin legally.<\/p>\n<p>&nbsp;<\/p>\n<h3>Steps to take at city hall<\/h3>\n<ol>\n<li><strong>Submit the application <\/strong>and the required documentation.<\/li>\n<li><strong>Pay municipal fees and taxes. <\/strong><\/li>\n<li><strong>Wait for the city council&#8217;s technical <\/strong>and zoning review.<\/li>\n<li><strong>Obtain the license <\/strong>or authorization.<\/li>\n<li><strong>Begin construction within <\/strong>the established timeframe.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<h3>Common mistakes to avoid<\/h3>\n<p>When it comes to building permits, some common mistakes include <strong>starting construction without the required permits<\/strong>, or submitting <strong>documentation<\/strong> that is <strong>incomplete or contains incorrect information<\/strong>, as this can delay the processing of the application.<\/p>\n<p>Other common mistakes include <strong>performing work that differs from or exceeds what was authorized<\/strong> under the permit, which could result in penalties from the city government.<\/p>\n<p>If you\u2019d like to learn more about this topic, we recommend our previous post on <a href=\"https:\/\/www.grupomalasa.com\/en\/stages-commercial-architecture-project\/\"><u>the phases of a commercial architecture project<\/u><\/a>, where we explain the entire process from the initial analysis to the handover of the finished space.<\/p>\n<p>&nbsp;<\/p>\n<p>If you\u2019re considering a renovation or commercial architecture project, we offer a\u00a0<a href=\"https:\/\/www.grupomalasa.com\/en\/360-services\/\"><u>servicio 360\u00ba service <\/u><\/a>that supports you from permit processing through to the final handover of the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RESIDENTIAL PROMOTION OF GRUPO MALASA IN ALMU\u00d1\u00c9CAR, HAND BY HAND WITH OUR CONSTRUCTION COMPANY NOA\u00b7AD<\/p>\n","protected":false},"author":5,"featured_media":33069,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"off","neve_meta_content_width":70,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","neve_meta_reading_time":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-33066","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-trends"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Guide to Building Permits for Renovating a Commercial Space.<\/title>\n<meta name=\"description\" content=\"Find out what building permits you need to renovate your commercial space, the types of building permits available, and the requirements for obtaining them.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guide to Building Permits for Renovating a Commercial Space.\" \/>\n<meta property=\"og:description\" content=\"Find out what building permits you need to renovate your commercial space, the types of building permits available, and the requirements for obtaining them.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/\" \/>\n<meta property=\"og:site_name\" content=\"Malasa\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-27T07:04:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T07:09:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/MINIATURA-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"793\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Grupo Malasa\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/\"},\"author\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/#organization\"},\"headline\":\"GUIDE TO BUILDING PERMITS FOR RENOVATING A COMMERCIAL SPACE\",\"datePublished\":\"2026-07-27T07:04:11+00:00\",\"dateModified\":\"2026-07-27T07:09:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/\"},\"wordCount\":796,\"publisher\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.grupomalasa.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/MINIATURA-1.jpg\",\"articleSection\":[\"News and trends\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/\",\"url\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/\",\"name\":\"Guide to Building Permits for Renovating a Commercial Space.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.grupomalasa.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/MINIATURA-1.jpg\",\"datePublished\":\"2026-07-27T07:04:11+00:00\",\"dateModified\":\"2026-07-27T07:09:32+00:00\",\"description\":\"Find out what building permits you need to renovate your commercial space, the types of building permits available, and the requirements for obtaining them.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.grupomalasa.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/MINIATURA-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.grupomalasa.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/MINIATURA-1.jpg\",\"width\":1024,\"height\":793,\"caption\":\"El exterior de una estructura de hormig\u00f3n en construcci\u00f3n, rodeada de andamios y materiales.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/guide-to-building-permits-for-renovating-a-commercial-space\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News and trends\",\"item\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/category\\\/news-and-trends\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"GUIDE TO BUILDING PERMITS FOR RENOVATING A COMMERCIAL SPACE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/\",\"name\":\"Malasa\",\"description\":\"Grupo\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#organization\"},\"alternateName\":\"Grupo Malasa\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#organization\",\"name\":\"Malasa\",\"alternateName\":\"Grupo Malasa\",\"url\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.grupomalasa.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/grupomalasa.png\",\"contentUrl\":\"https:\\\/\\\/www.grupomalasa.com\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/grupomalasa.png\",\"width\":48,\"height\":48,\"caption\":\"Malasa\"},\"image\":{\"@id\":\"https:\\\/\\\/www.grupomalasa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Guide to Building Permits for Renovating a Commercial Space.","description":"Find out what building permits you need to renovate your commercial space, the types of building permits available, and the requirements for obtaining them.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/","og_locale":"en_US","og_type":"article","og_title":"Guide to Building Permits for Renovating a Commercial Space.","og_description":"Find out what building permits you need to renovate your commercial space, the types of building permits available, and the requirements for obtaining them.","og_url":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/","og_site_name":"Malasa","article_published_time":"2026-07-27T07:04:11+00:00","article_modified_time":"2026-07-27T07:09:32+00:00","og_image":[{"width":1024,"height":793,"url":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/MINIATURA-1.jpg","type":"image\/jpeg"}],"author":"Grupo Malasa","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#article","isPartOf":{"@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/"},"author":{"@id":"https:\/\/www.grupomalasa.com\/#organization"},"headline":"GUIDE TO BUILDING PERMITS FOR RENOVATING A COMMERCIAL SPACE","datePublished":"2026-07-27T07:04:11+00:00","dateModified":"2026-07-27T07:09:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/"},"wordCount":796,"publisher":{"@id":"https:\/\/www.grupomalasa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#primaryimage"},"thumbnailUrl":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/MINIATURA-1.jpg","articleSection":["News and trends"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/","url":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/","name":"Guide to Building Permits for Renovating a Commercial Space.","isPartOf":{"@id":"https:\/\/www.grupomalasa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#primaryimage"},"image":{"@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#primaryimage"},"thumbnailUrl":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/MINIATURA-1.jpg","datePublished":"2026-07-27T07:04:11+00:00","dateModified":"2026-07-27T07:09:32+00:00","description":"Find out what building permits you need to renovate your commercial space, the types of building permits available, and the requirements for obtaining them.","breadcrumb":{"@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#primaryimage","url":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/MINIATURA-1.jpg","contentUrl":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2026\/06\/MINIATURA-1.jpg","width":1024,"height":793,"caption":"El exterior de una estructura de hormig\u00f3n en construcci\u00f3n, rodeada de andamios y materiales."},{"@type":"BreadcrumbList","@id":"https:\/\/www.grupomalasa.com\/en\/guide-to-building-permits-for-renovating-a-commercial-space\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/www.grupomalasa.com\/en\/"},{"@type":"ListItem","position":2,"name":"News and trends","item":"https:\/\/www.grupomalasa.com\/en\/category\/news-and-trends\/"},{"@type":"ListItem","position":3,"name":"GUIDE TO BUILDING PERMITS FOR RENOVATING A COMMERCIAL SPACE"}]},{"@type":"WebSite","@id":"https:\/\/www.grupomalasa.com\/en\/#website","url":"https:\/\/www.grupomalasa.com\/en\/","name":"Malasa","description":"Grupo","publisher":{"@id":"https:\/\/www.grupomalasa.com\/en\/#organization"},"alternateName":"Grupo Malasa","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.grupomalasa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.grupomalasa.com\/en\/#organization","name":"Malasa","alternateName":"Grupo Malasa","url":"https:\/\/www.grupomalasa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.grupomalasa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2023\/05\/grupomalasa.png","contentUrl":"https:\/\/www.grupomalasa.com\/wp-content\/uploads\/2023\/05\/grupomalasa.png","width":48,"height":48,"caption":"Malasa"},"image":{"@id":"https:\/\/www.grupomalasa.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/posts\/33066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/comments?post=33066"}],"version-history":[{"count":8,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/posts\/33066\/revisions"}],"predecessor-version":[{"id":34536,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/posts\/33066\/revisions\/34536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/media\/33069"}],"wp:attachment":[{"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/media?parent=33066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/categories?post=33066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.grupomalasa.com\/en\/wp-json\/wp\/v2\/tags?post=33066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}